* Now we are accepting online permit applications *
Before applying online, please note the following:
The following CANNOT be applied for online: Additions /
Antennas / Commercial Interior Renovations / Demolition of
Buildings / Inground Swimming Pools / New Houses / New
Commercial Buildings / Tenant Fit-outs / Sheds
Please use this link to start your online permit process * ONLINE ACCESS *
Please be advised your application is not a valid application
until payment is paid and the submit button has been
clicked. The application date will be the date payment is
made and the application is submitted.
Do you live in the Historic District of Wethersfield? What you need to know before making changes...click here -> Historic District Commission
Building Inspection
The Building Inspection Department enforces all building codes, acts and regulations. The department inspects all phases of construction, including electrical, mechanical, plumbing , structural installations and acts as consultant to other town departments and agencies.
As of October 1st 2022, the state had adopted new building codes and amendments.
Look up a contractor's license.
Building Permits
A permit is required for any person who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by state code, or to cause any such work to be done. The property owner is responsible for obtaining a building permit, but often a contractor will apply on behalf of the property owner.
Before applying for a permit, you should review the flow chart for construction documents and it is recommended to contact each of the following departments individually : Engineering/Wetlands , Zoning , Planning , Economic Development for their departmental requirements
Forms are available from the department's permits and forms page. Payment and any necessary documentation must accompany the application.
All work can be performed between the hours of 7:00 a.m and 10:00 p.m Monday through Saturday and the hours between 9:00 a.m and 10:00 p.m on Sunday.
certificate of occupancy
The Building Department requires a sign off from all other departments. All life safety, FINAL INSPECTIONS and supporting documentation needs to be provided 30 days prior to issuing a C of O. Some, if not all might be required. Please discuss with the Building Department and or the appropriate department that requested additional information.
- All rough and final inspections to be performed
- Fire Marshal, Zoning, Planning, Health, Wetlands and Engineering sign offs
- Public Act No.16-45 requires documentation of the individual or entity that supplied the concrete and the name or entity that installed the concrete. This is required prior to C/O issuance
- Design professional letter of completion
- Statement of professional opinion
- Final special inspection reports
- State elevator certificate
- State Boiler inspector sign off
- As-Built survey
eNGINEERING division
The Engineering Division provides engineering and surveying expertise in all matters relating to municipal engineering for the Town of Wethersfield. The Division is responsible for preparing and administering the capital budget; design and management of municipal construction projects; administration of annual sidewalk maintenance, pavement marking, crack sealing and road paving programs; reviewing proposed development plans for local boards and commissions and providing technical assistance to various committees; contractor licensing and permitting for improvements within the public right-of-way; administering the survey, mapping and technical requirements of a town-wide Geographic Information System; and in general, assuring that the interests of the Town residents are met in all engineering and surveying matters.
Solar
We recognize putting solar on your house can save you money and is great for the environment! Please select the highlighted SOLAR link to get the processes started.
Permit fee
Building,Electrical,Plumbing and Heating permits: $30.26 for the first $1000 of estimated cost and $16.26 for each additional $1000 of estimated cost rounded up.
|