Building

Notice: New Online Building Permit System

The Building Department has transitioned to a new online permitting system. City Squared is no longer used for building permits. All building permit applications must now be submitted through OpenGov.  

If you have questions or need assistance with the new platform, please contact our Department. 

Building Inspection

The Building Inspection Department enforces all building codes, acts and regulations. The department inspects all phases of construction, including electrical, mechanical, plumbing, structural installations and acts as consultant to other town departments and agencies.

As of October 1st 2022, the state had adopted new building codes and amendments.

Look up a contractor's license.

Certificate of Occupancy

The Building Department requires a sign off from all other departments. All life safety, final inspections and supporting documentation needs to be provided 30 days prior to issuing a C of O. Some, if not all might be required. Please discuss with the Building Department and or the appropriate department that requested additional information.

  • All rough and final inspections to be performed
  • Fire Marshal, Zoning, Planning, Health, Wetlands and Engineering sign offs
  • Public Act Number 16-45 requires documentation of the individual or entity that supplied the concrete and the name or entity that installed the concrete. This is required prior to C/O issuance
  • Design professional letter of completion
  • Statement of professional opinion
  • Final special inspection reports
  • State elevator certificate
  • State Boiler inspector sign off
  • As-Built survey

Solar

We recognize putting solar on your house can save you money and is great for the environment! Please select the Solar Instructions (PDF) to get the processes started.

Documents